Lead time
45 to 90 days, counted from the day the order is placed. On most lines it is 45 to 60; 90 is the outside figure on the slowest. Both are approximate.
The range is wide for a reason the General Manager has stated publicly: demand has at times run ahead of capacity, and that delayed deliveries. Since then the factory has added lines and set up a separate unit for conformity batches, so those no longer take time on the commercial lines.
That clock covers manufacturing. It does not cover registering the product, which runs separately.
Registration runs on its own clock
This is the part that decides when you can actually sell, and it is usually the long pole — not the manufacturing. There are two routes, and they are months apart.
- A new NFSA registration
- Roughly six months to a year. Your own file, your own number, not tied to any factory.
- Adding our factory to a registration you already hold
- The fast route. Weeks rather than months, because the product is already registered.
Which route applies depends on what you already have, so say where you stand when you enquire. Export approvals are a separate step again and sit outside both figures.
Minimum order
There is no single minimum. A new product starts small and steps up.
- A conformity batch for the Authority — about 1,000 units. This is the run the registration is checked against, not stock to sell.
- The first batch for the market.
- A second batch, and from there production runs normally.
As an indication a commercial batch is in the region of 5,000 units. Both figures are approximate: the real number depends on the dosage form, the packaging and the ingredients, so ask for one against your own specification.
What you supply
As much as you are able to. The starting assumption is that the product is yours.
- The registration file is yours. We manufacture against it. You are not tied to this factory by the paperwork.
- The formula, if you have one. If you do not, our R&D will work one up with you.
- The raw materials, either way — supply them yourself, or we supply them.
- Packaging and labelling materials are yours to buy. We do not source them for you, but we will point you at suppliers we work with. Budget the cost and the lead time for these on your side.
What happens in what order
- You send the brief or the formula.
- R&D looks at whether it can be made as specified, and says so before anything is committed.
- A sample, made and sent to you.
- A trial run.
- Registration, by whichever of the two routes applies.
- Production, manufactured to the concentration declared in the registration.
- In-process checks during the run, and release by the quality team.
- Collection, Ex Works at the factory in Sadat City.
Capacity
3 million units a month across all dosage forms, reached at the start of 2026.
Shipping
Priced Ex Works by preference — at the factory gate in Sadat City. We can also handle the shipping and the customs formalities and deliver to your country, by agreement.
Price
Quoted against your specification. We do not compete on price, and we would rather say so plainly than quote low and meet it somewhere you would not want us to.